How to Choose the Right Generator Size (kVA) for Your Site
· By Devta Gensets team
Pick a generator that is too small and it trips the moment a big motor starts. Pick one that is too big and you pay for diesel and rent on capacity you never use, and the engine runs badly at light load. Getting the size right is the single most useful thing you can do before you buy or hire a DG set.
Here is the method we use with customers every day.
1. List everything the generator has to run
Walk the site and write down every load that must stay on during a power cut: motors, pumps, lifts, compressors, HVAC, lighting, IT racks, welding sets, cranes. Note the rating of each one from its nameplate, in kW or HP. If a rating is in HP, multiply by 0.746 to get kW.
Be honest about what really needs backup. Many sites put only their critical loads on the generator and leave the rest on grid power.
2. Add up the running load
Total the kW of everything that can run at the same time. This is your running load. If some machines never run together, you do not need to add both.
3. Allow for starting current
Electric motors draw several times their running current for a few seconds when they start. A large pump or compressor started direct-on-line can pull far more than its rated load for that moment. The generator has to handle this surge without the voltage dropping so far that other equipment trips.
Two ways to deal with it: start the biggest motors one after another instead of all at once, or use star-delta starters, soft starters or VFDs, which cut the starting surge a lot. Tell your generator supplier which motors you have and how they are started, because it changes the answer.
4. Convert kW to kVA
Generators in India are rated in kVA. To convert, divide kW by the power factor. Most DG sets are rated at a power factor of 0.8, so:
kVA = kW / 0.8
A 400 kW load needs about 500 kVA.
5. Leave headroom
Do not size the set to run at 100%. Diesel engines are happiest at roughly 70 to 80% of their rating. That leaves room for starting surges and for the load you will add next year. Running a big set at very low load for long periods is also bad for it, because the engine never gets hot enough and carbon builds up.
A worked example
A small factory needs backup for:
- Machines and motors: 220 kW
- Air compressor: 45 kW
- Lighting and offices: 35 kW
Running load is 300 kW. Divided by 0.8 that is 375 kVA. To run at around 75% load, the set should be about 500 kVA. If the compressor and the biggest machines start together direct-on-line, we would check the starting surge before confirming the size.
Common mistakes
- Adding up connected load instead of running load. Not everything runs at once, so this oversizes the set.
- Ignoring motor starting. The set handles the running load fine and then trips every time the lift or pump starts.
- Forgetting future load. A new machine six months later means a second generator or a swap.
- Mixing up kW and kVA. A "500" quoted in kW is a much bigger machine than 500 kVA.
When to get a site survey
For anything above a few hundred kVA, for sites with large motors, or when generators will run in parallel, a site visit is worth it. An engineer can read your electricity bills, check the panel, and measure the real load instead of guessing.
Devta Gensets supplies and rents DG sets from 125 kVA to 2000 kVA across Delhi NCR and the rest of India. Share your load list with us and we will tell you the size that fits, free of charge. Get in touch or browse our gensets by power range.